banner

APU Starting GPU

1.Output: 115V/200V 400Hz, three‑phase four‑wire
2.Capacity: 90kVA continuous, 250% for 30 seconds (APU start surge)
3.Input: 380‑480V three‑phase, 50/60Hz ±15%
4.Compliance: MIL‑STD‑704F, ISO6858
5.Applications: Starting APUs on narrow‑body and wide‑body aircraft, high‑inrush ground power for engine start
6.Key features: Extra‑high overload rating (250% for 30s), fast transient response, auto voltage compensation
7.Brand: ACSOON.
Send Inquiry Download
  • Product Description
 

APU Starting GPU | High‑Surge 400Hz Ground Power for Auxiliary Power Unit Starts

 

Starting an APU is hard on a ground power unit. The inrush current spikes to 2‑2.5x the normal rating for a solid 20‑30 seconds. A lot of GPUs can't handle that. They trip, or they sag, and the APU starter complains.The APU Starting GPU was built for exactly this job. It's a 90kVA unit on paper, but we over‑rated the IGBTs and transformer so it can deliver 250% for 30 seconds without breaking a sweat. That's enough for the biggest APUs on 737s, A320s, 777s, and even some 787s.If your main use case is APU starts – not just running avionics – this is the one you want.

APU Starting GPU
APU Starting GPU
APU Starting GPU

Datasheet
 
ParameterSpecification
Model SeriesACSOON GPU400‑HD Series
Model NumberGPU400‑330090
Input3‑phase 380V/400V/415V/440V/480V ±15%, 50/60Hz
Output115V/200V 400Hz, 90kVA continuous
Overload250% for 30 seconds, 150% for 2 minutes
Voltage THD<2% at linear load (normal load)
Voltage Regulation±1% at 0‑100% load, ±2% at 250% load
Frequency Stability≤0.01%
Input Power Factor≥0.9
Efficiency92% at 90kVA
ProtectionsOver‑voltage, over‑current (set to 300% trip), short circuit, over‑temp
ComplianceMIL‑STD‑704F
EnclosureIP54, same as standard 90kVA

 If you need it,Contact us at Email: acpower@acsoonpower.com

APU Starting GPU
 
 

APU Starting GPU Main Features

  • Reinforced IGBT module – We use a larger die than the standard 90kVA. More silicon, less heat.
  • Custom output transformer – Lower impedance than off‑the‑shelf parts. Handles the inrush without saturating.
  • Current limit off – No foldback during overload. You get full current until the thermal limit, which is set high.
  • Thermal headroom – Rated for 250% at 40°C ambient. We don’t derate you in a hot hangar.
APU Starting GPU

Why Choose ACSOON APU Starting GPU?

  • Serious overload – 250% for 30 seconds. That’s not a typo. We tested it to 300% for 20 seconds and it still held.

  • No voltage sag – Even at 2.5x load, output stays within MIL‑STD‑704 limits. Your APU won’t drop out.

  • Fast recovery – When the APU generator comes online, the GPU backs off without overshoot or oscillation.

  • Same size as standard 90kVA – You don’t need a bigger cabinet. It fits the same footprint.

APU Starting GPU Application Areas

  • Airlines with high APU usage – Frequent engine starts, quick turns, hot climates where APU runs the whole ground time.

  • MRO facilities – Testing APUs after overhaul requires repeated start cycles. This unit survives the abuse.

  • Military airlift – C‑17, C‑5, A400M. Their APUs draw hard, especially in cold weather starts.

  • Cargo operators – Loading at remote stands with no preconditioned air, APU runs constantly.

Application Areas

Our Services

Quality Control
01

Quality Control

  • Overload torture test – Every unit runs at 250% load for 30 seconds, then 150% for 2 minutes. We do this twice.

  • Thermal imaging – At 250% load, we check every power component. Nothing exceeds 110°C.

  • APU simulator test – We have a load bank that mimics APU inrush profile. Each unit must pass 10 consecutive starts.

  • Final sign‑off – The test engineer initials a checklist. No digital pass‑through.

02

R&D Results

  • Learned from field returns – Customers kept blowing fuses on standard 90kVA units during APU starts. We upped the trip point and beefed up the rectifier.

  • Transformer redesign – Switched from aluminum to copper windings. Heavier, but handles the surge without heating up.

  • Added soft start on input – When the GPU first connects to the grid, it ramps up slowly. Stops the hangar lights from flickering.

  • Simplified the control logic – Removed the current foldback feature. If the APU wants 250%, it gets 250% until the thermal switch trips (which takes over a minute).

R&D Results
Packaging And Transportation
03

Packaging and Transportation

  • Standard GPU packaging – Bolted to a skid, stretch‑wrapped, strapped. Fits in a 20ft container.

  • Cable reel optional – If you need one, it ships separately.

  • Manual – Printed quick guide laminated. Full manual on USB.

  • Export crate – Optional wood crate for sea freight.

04

After‑Sales Service

  • 2‑year warranty on the entire unit, including the overload rating.

  • 1‑year on the cable and plug.

  • Spare parts stocked in Xi’an, Miami, and Singapore.

  • Email support – we have a tech who used to be an APU mechanic.

After‑Sales Service

 

 Qualification Certification

CE – LVD and EMC; MIL‑STD‑704F – Test report from a third‑party lab; ISO 9001:2015 – Our Xi’an facility; IP54 – SGS certified.

CE Certification
ISO Certification
 

 

FAQ

Q: Why can’t I just use a standard 90kVA GPU for APU starts?
A: You can, for a while. But standard GPUs are designed for 150% overload for 60 seconds. APU start surges can hit 250% and last 20‑30 seconds. That’s outside the spec. You’ll get nuisance trips, and eventually you’ll blow IGBTs. This unit is built for that abuse.
Q: What’s the maximum starting current?
A: At 115V, 250% of 90kVA is about 225kVA – roughly 650A per phase. That’s enough for any APU we’ve seen. If you need more, we have a 120kVA version with the same 250% rating.
Q: Can I use this as a normal GPU for avionics?
A: Yes. When it’s not starting an APU, it behaves exactly like our standard 90kVA unit. Same power quality, same features. You’re not giving anything up.
Q: Does it cost more than a standard 90kVA GPU?
A: About 15% more. The beefier IGBTs and transformer cost real money. But if you’re killing standard units every couple of years, the payback is less than 12 months.
Q: What’s the lead time?
A: 6‑8 weeks. We build these to order because the overload rating requires hand‑matching of components.

 

Contact Us

​​​​​​​
For technical specifications or global solutions for the APU Starting GPUacpower@acsoonpower.com, or submit your requirements using the form at the bottom of our website.

Online Message
Learn about our latest products through SMS or email