ACSOON Xi'an Exhibition 2026 | Meet Us in Dubai

September 7, 2026

Aviation, marine and industrial power conversations continue this October.

By ACSOON Team | 5 September 2026

Thank you to everyone who visited ACSOON at the Xi'an International Convention and Exhibition Center (Chanba) from 3 to 5 September 2026. Our Xi'an exhibition has come to a successful close, and we appreciate the time visitors spent with our team and the equipment on display.

Our next stop is Dubai. ACSOON is preparing to exhibit at Airport Show 2026, taking place from 12 to 14 October at Dubai World Trade Centre. We are also arranging customer meetings during a tentative 12–16 October visit. If you work in aviation, marine engineering or industrial testing, we would welcome the opportunity to discuss your next power project in person.

news-1-1

ACSOON's display at the Xi'an exhibition, September 2026.

Thank you, Xi'an: three days around real equipment

At Hall 2, Booth B11, our display brought compact power supplies and larger cabinet systems into one space. Visitors could see the control panels, equipment layouts and different formats at close range, then sit down with the ACSOON team to continue the conversation.

The exhibition covered advanced manufacturing, digital industry and defense technology. For ACSOON, it was an opportunity to present the range of our power equipment and meet the people who specify, purchase and use it. The photographs from the stand capture both sides of that experience: visitors examining the equipment and discussions continuing around the meeting tables.

To those who met us in Xi'an, please stay in touch. A nameplate photograph, an electrical specification or a short description of the intended application will help us take the next step with you. If a requirement still needs clarification, we can work through it before preparing a proposal.

What would you like to discuss in Dubai?

A ground power unit for an aircraft, a shore power converter for a vessel and an AC source for a test bench have different jobs. The most useful starting point is the load, the available supply and the conditions at the installation site.

Dubai

Application

ACSOON product direction

Useful information to bring

Aircraft AC ground power

400Hz ground power units; common 30–180 kVA options

Aircraft requirement, kVA, output voltage, cable length and installation location

Aircraft DC power

28V DC / 28.5V DC and 270V DC power supply options

Required DC voltage, continuous current, peak current and duration

Marine and shore power

ACF60W marine frequency converters and shore-to-ship power supplies

Dockside supply, vessel voltage/frequency, load list and environment

Industrial testing

AF60W static frequency converters; ACSW programmable AC power supplies

Test voltage/frequency, load behavior, operating sequence and control interface

Aircraft ground power: confirm the requirement at the aircraft

For a 400Hz ground power unit, rated capacity is only part of the specification. A project calling for 115/200V, 400Hz power also needs agreement on the aircraft connection, cable arrangement, operating duty and installation format. A hangar installation and a mobile apron unit may need different arrangements for access, movement and cable handling.

For a 28V DC ground power unit, distinguish continuous current from any short-duration peak requirement. Tell us whether the intended use is maintenance, testing or starting support, and provide the relevant aircraft or equipment specification. A 270V DC requirement should be reviewed separately against the intended load and interface.

For outdoor sites, bring the expected ambient temperature and exposure conditions. Cooling, enclosure protection and any required derating should be discussed against the proposed configuration. If a tender specifies MIL-STD-704F or another standard, send the exact requirement so that the applicable evidence can be reviewed for the model under consideration.

Marine power: start with the dockside and vessel supplies

A marine frequency converter must be selected around both ends of the connection: what the shore can supply and what the vessel needs. For an ACF60W shore power discussion, useful inputs include voltage, frequency, phase arrangement, available shore capacity and a load list.

For example, pumps and compressors can affect the required capacity during starting. The review should also cover phase imbalance, installation space, ventilation, cable entry and exposure to humidity or salt air. Where a project requires a particular class approval or witnessed test, identify it early so the documentation and acceptance scope can be agreed before ordering.

Industrial testing: describe the test as well as the power rating

The AF60W static frequency converter range supports applications requiring conversion between 50Hz and 60Hz, with voltage and frequency options depending on the selected configuration. For repeatable test sequences, ACSW programmable AC power supplies provide a separate product direction to discuss.

Tell us the voltage and frequency range, single-phase or three-phase requirement, load characteristics and test duration. If the test involves repeated changes, remote control or data collection, include the sequence and interface requirements. This helps establish whether a frequency converter or a programmable source is the better starting point.

The manufacturing operation behind ACSOON

Xi'an Jerrystar Instrument Co., Ltd. was established in 2007. In 2026, that represents 19 years of experience in power supply and power conversion equipment. Our work covers AC/DC power supplies, frequency converters and ground power equipment for aviation, marine and industrial applications.

The ACSOON manufacturing operation in Jinghe New City, Shaanxi, has approximately 7,000 m² of production and operating space. The company profile records more than 60 patents. Alongside standard product ranges, our engineering and OEM work allows us to discuss requirements for electrical output, cabinet layout, controls and system integration.

For a buyer, the value of that manufacturing background is the ability to examine a requirement with the people responsible for the equipment. During supplier evaluation, we welcome questions about the proposed design, production arrangements, quality checks and the documentation needed for your approval process. Our company overview is a useful starting point.

Certification documents should match the proposed equipment

Our company qualification information includes ISO 9001 quality management certification and CE documentation for applicable products. For your purchasing review, ask for the current documents relevant to the company and equipment being proposed.

A practical review separates the factory's quality management system from the documentation for a particular product. Check the certificate holder and scope for ISO 9001, and the model coverage, declaration and supporting reports applicable to a CE requirement. Aviation, marine or project-specific requirements should be reviewed separately against the tender.

We encourage customers to send their supplier qualification checklist before the meeting. It gives us time to identify the relevant documents and address any points that need further review.

Agree on testing, delivery and support before the order

A useful technical meeting should also establish how the equipment will be accepted and supported. Bring your acceptance checklist, or ask us to discuss a suitable scope for the proposed unit. Points to agree include:

• Test conditions: input supply, output settings, representative load and operating duration.

• Acceptance evidence: the measurements, protection checks, reports, photographs or videos required by the project.

• Delivery scope: cables, plugs, drawings, manuals, packaging and any installation assistance included in the quotation.

• After-sales arrangements: warranty coverage, fault reporting, spare parts and commissioning support.

Any special testing, witnessed inspection or additional documentation should be included in the agreed technical and commercial scope. Delivery timing can then be discussed against the confirmed configuration and production requirements.

Meet ACSOON at Airport Show 2026

We invite existing customers, companies already discussing a project with us and new contacts across the Middle East to arrange a meeting. Airport and MRO teams are welcome, as are shipyards, marine service companies, industrial laboratories, equipment manufacturers and distributors working on relevant power applications.

Meeting information

Current arrangement

Official exhibition

Airport Show 2026

Exhibition dates

12–14 October 2026

Venue

Dubai World Trade Centre, Dubai, UAE

ACSOON visit window

Tentatively 12–16 October 2026, including customer meetings

Meeting format

At the exhibition or a separately arranged customer visit, subject to confirmation

The exhibition dates and our wider visit window are different. Our final travel and customer visit schedule will be adjusted according to confirmed meetings. Please contact us for the meeting location and latest arrangements before making plans specifically to meet our team.

Send a few details so we can prepare

If you plan to be in Dubai, or would like to explore a meeting during our visit, please share:

• Your company name, country and city, main business and company website.

• Your contact person's name and role, business email and preferred contact number.

• The application, product or model of interest, key electrical requirements and expected project timing.

• Your preferred date and meeting format. For a requested site visit, please include the address and on-site contact.

Existing ACSOON customers can also send the model and serial number of equipment they would like to discuss. If you have already received a quotation, including its reference will help us prepare the right material.

Marine and industrial customers are welcome to contact us even if they are not attending Airport Show. Customer visits will depend on location and the final itinerary, and each appointment will be confirmed directly.

A few questions before we meet

Can we discuss a customized power supply?

Yes. Send the electrical specification, application and installation constraints. We can review the requirement and discuss the proposed configuration, engineering scope and relevant documentation.

Can we review references relevant to the Middle East?

Please tell us your country, industry and application. We can discuss which relevant project references or application materials are available for review. Customer identities, photographs and videos will be shared only where permitted.

Can you confirm the delivery time during the meeting?

We can discuss the schedule once the model, quantity, configuration and inspection requirements are clear. The delivery commitment will be set out in the agreed quotation or order documentation.

Can we meet if we do not yet have a complete specification?

Yes. A load nameplate, the available input supply and a short application description are enough to start a useful discussion. We can then identify the remaining information needed for selection.

Thank you again to the visitors and partners who joined us in Xi'an, and to the ACSOON colleagues who prepared the display and supported the stand. We look forward to continuing those conversations in Dubai.

Arrange a Dubai Meeting | Request a Technical Recommendation

Email: acpower@acsoonpower.com
WhatsApp: +86 199 2997 8925
Suggested email subject: Dubai Meeting 2026 – Your Company – Application

Sources of Related Content

Airport Show Official Website: 2026 Event Dates and Venue

​​​​​​​More LinkedIn articles on the Xi'an exhibition​​​​​​​

ACSOON About Us: Company History, Business Scope, and Certifications
ACSOON 19th Anniversary Article
400Hz Solid State GPU Product Page
28VDC Solid State GPU Product Page
ACF60W Marine AC Power Supply Product Page
AF60W Frequency Converter / AC Power Supply Product Page
ACSW Programmable Power Supply Product Page
Google: AI features and your website
Google: Creating helpful, reliable, people-first content
Bing Webmaster Guidelines

Online Message
Learn about our latest products through SMS or email